washout$91186$ - traduzione in greco
Diclib.com
Dizionario ChatGPT
Inserisci una parola o una frase in qualsiasi lingua 👆
Lingua:

Traduzione e analisi delle parole tramite l'intelligenza artificiale ChatGPT

In questa pagina puoi ottenere un'analisi dettagliata di una parola o frase, prodotta utilizzando la migliore tecnologia di intelligenza artificiale fino ad oggi:

  • come viene usata la parola
  • frequenza di utilizzo
  • è usato più spesso nel discorso orale o scritto
  • opzioni di traduzione delle parole
  • esempi di utilizzo (varie frasi con traduzione)
  • etimologia

washout$91186$ - traduzione in greco

PERIOD BEFORE A CLINICAL TRIAL IS COMMENCED WHEN NO TREATMENT IS GIVEN
Washout period

washout      
n. έκπλυση, αποτυχία
wash out         
WIKIMEDIA DISAMBIGUATION PAGE
Wash-out; Wash out; Washouts; Wash outs; Wash-outs; Washout (disambiguation)
ξεπλένω
water closet         
  • [[Thomas William Twyford]] was one of the leading marketers of flush toilets in their first boom of popularity after the [[Great Exhibition]] of 1851.
  • 219x219px
  • The bowl drain is visible at the rear of the bowl, connected to the waste pipe.
  • [[Joseph Bramah]]'s improved version was the first practical flush toilet.
  • 220x220px
  • S-trap]], which laid the foundations for the modern flush toilet.
  • alt=Washout WC
  • A simplified cross-section through a siphonic toilet. The arrows show the flow of the flush water through the rim and jet into the bowl and out through the elongated S-shaped siphon.
  • A double-trap siphonic WC. Water enters at (A) pulling air into the aspirator (B) from the siphon leg (E) before passing into the rim (C) and into the pan (D). Water from the first trap in the bowl (F) is pushed through the siphon and out through the second trap (G) to the drain.
  • A flush toilet bowl during flushing action
  • Four common types of WC pan: washdown (figure 1); washout (figure 2); double-trap siphonic (figure 3); single-trap siphonic with jet (figure 4).
  • An elevated cistern produces a high-pressure flush using [[hydrostatic pressure]].
  • Roman]] public latrine found in the excavations of [[Ostia Antica]]
  • Reconstruction drawing showing the communal latrines in use, [[Housesteads Roman Fort]] (Vercovicium)
  • A simplified diagram of a siphonic WC cistern. The siphon is formed of a vertical pipe (1) that links the flush pipe (2) to a domed chamber (3). A perforated disc (4) covered by a flexible plate or flap (5) is joined by the siphon rod (6) to the flush lever (7).
  • Sloan pressure vessel
  • Flush toilets were widely available from the mid to late 19th century. Although [[Thomas Crapper]] did not invent the flush toilet, he was a leading manufacturer.
  • Typical sound of a flush toilet
  • Vacuum toilet in a train in Switzerland
  • [[George Jennings]] trademark on his manufactures
  • Spraying glaze onto a closet
TOILET THAT DISPOSES OF HUMAN EXCRETA BY USING WATER TO FLUSH IT
Water closet; Water toilet; Flushing toilet; Low Suite; Low suite; Toilet flushing; Water Closet; Watercloset; Valve closet; W/C; Water closets; Flushing Toilet; Western toilet; Shit shelf; Water-closet; 🚾; Washout toilet; German toilet; Flapper valve; Flush tank; 🅏; 🆏; Western commode; Seawater flushing; Raw water flushing; Siphon jet; Courtesy flush; Mercy flush; Flush Toilet; Flush toilets; Lavatory pan
καμπίνες, αποχωρητήριο

Definizione

washout
¦ noun
1. informal a disappointing failure.
2. a breach in a road or railway track caused by flooding.
3. Geology a channel cut into a sedimentary deposit by rushing water and filled with younger material.
4. Medicine the removal of material from the body by washing with a fluid or by allowing it to be eliminated over a period.

Wikipedia

Run-in period

Run-in period is a period between the recruitment and randomization phases of a clinical trial, when all participants receive the same treatment, which may be active treatment, a placebo or no treatment at all. The clinical data from this stage of a trial are only occasionally of value but can serve a valuable role in screening out ineligible or non-compliant participants, in ensuring that participants are in a stable condition, and in providing baseline observations. A run-in period is sometimes called a washout period if treatments that participants were using before entering the clinical trial are discontinued.